Projects

Public Works

Liberty, Missouri

Rehabilitation of Sanitary Sewers – Phase II

$2,170,000

Engineer George Butler and Associates

Contact Brian Hess, City of Liberty

This project rehabilitated existing sanitary sewers in multiple locations in older, established neighborhoods. The rehab included:

  • 1,400 LF 8” PVC main replacement by open-cut
  • 2,800 LF point repairs by open cut
  • 3,700 LF 8” pipe bursting (replaced with 8”)
  • Hundreds of repair service connections
  • 7,300 LF 8” CIPP sewer main lining
  • Abandon existing sewer lines and manholes
  • Repair and restoration of existing manholes
  • Significant street, sidewalk, curb, driveway, and landscape restoration