$5.2 million
Engineer ET Archer
Contact Johnson County, Kansas, Wastewater
This major interceptor sewer project included:
- 28,000 LF 30-42” RCP pipe
- 2,110 LF tunneling
- Construction of 11 large structures and 64 manholes
- Extensive blasting for rock excavation and depths of up to 40 feet