This was a comprehensive I & I reduction project. The rehab included:

  • 750 LF of open-cut point repairs
  • 3,300 LF of complete mainline segment removal and replacement via pipe bursting
  • 80 EA open-cut lateral connection repairs
  • 650 EA trenchless lateral connection repairs
  • 1,600 LF of open-cut lateral replacement (including pipe bursting)
  • 14,300 LF lateral CIPP
  • 45,000 LF of mainline CIPP
  • 280 EA manhole casting replacementsKANSAS CITY, MISSOURI
  • 3,700 VF cementitious manhole lining and associated manhole rehab
  • 500 EA CIPP end seals
  • Extensive CCTV inspections